Supply Scope
Confirm the lodge configuration, included factory work, optional items and local responsibilities before quotation.
Factory production · Modular assembly · Export preparation
Sunhomee supplies one confirmed model on this page: the 50 m² Luxury One Bedroom Lodge. The order scope can cover configuration review, factory production, quality inspection, protective packaging and international shipping coordination.
Final drawings, finishes, supply boundary and delivery method are confirmed for each project before production.
Glamping lodge definition and project scope
A glamping lodge is a guest accommodation unit designed to provide the comfort of an indoor hotel room in a resort, campsite or nature-based setting. A modular glamping lodge is assembled in a factory and prepared for transport, while foundations, approvals, unloading, utility connections and site work are coordinated for the destination.
Confirm the lodge configuration, included factory work, optional items and local responsibilities before quotation.
Review the bedroom, living area, bathroom, kitchenette, storage and outdoor connection for the intended operation.
Use approved drawings and finish schedules to prepare materials, assemble the modules and complete the agreed interior scope.
Plan quality inspection, protective packaging, container use, shipping documents and destination delivery responsibilities.
Why Sunhomee
The work starts with the project country, quantity, configuration and delivery boundary. Those details are used to prepare the quotation, production documents and export plan.
Country, site access, intended use, quantity and target date are recorded before the supply scope is prepared.
Layout, finishes, utilities, furniture and optional items are listed in the documents used for quotation and production.
Material preparation, modular assembly, interior work and quality inspection follow the approved scope.
Packaging, container planning, shipping documents and delivery coordination are reviewed for the destination.
Confirmed hero product
A 50 m² modular hospitality unit organized around a bedroom, living area, bathroom, kitchenette and private outdoor connection.
Configuration & customization options
These are configuration directions for the Luxury One Bedroom Lodge, not additional product models.
Final drawings, specifications, scope and pricing are issued only after project requirements are reviewed and confirmed.
Technical scope before production
Drawings and schedules record the structure, building envelope, interior work and utility interfaces included in the order. Material grades, insulation, structural loads and certifications are stated only when they are confirmed for the project.
The approved drawings define the modules to be assembled in the factory and the transport method used for the order.
Roof, exterior finish, windows, doors, sealing and destination requirements are recorded before material preparation.
Floor, wall, ceiling, bathroom, kitchenette and furniture inclusions are listed before factory production begins.
The order documents identify factory-installed electrical, water, drainage and HVAC work and the connections required on site.
Factory manufacturing
These factory and logistics images document manufacturing stages and export preparation. They are evidence of the process shown, not additional lodge models or project claims.
Application scenarios
These are planning contexts and concept examples—not claims of delivered Luxury One Bedroom Lodge projects.
Use privacy, tree cover, pedestrian access and low-impact site connections to shape the accommodation layout.
Explore Forest Resort planningCoordinate views, waterfront setbacks, access, utilities and guest circulation before locating accommodation units.
Explore Lake Resort planningCombine accommodation choice with project phasing, guest facilities, operating needs and local approval review.
View Glamping Resort SolutionsFrequently asked questions
Yes. Sunhomee supports project discussion, configuration, factory manufacturing, packing and international delivery coordination for modular hospitality accommodation.
This page presents one confirmed product: the 50 m² Luxury One Bedroom Lodge. Other lodge models are not presented as confirmed products.
Configuration can be discussed around the project brief, destination, guest experience, interior finish, utilities, furniture and outdoor connection. Final scope is confirmed before quotation.
There is no single price for every project. Cost depends on the confirmed configuration, quantity, supply boundary, destination, packing, freight and site responsibilities. Sunhomee prepares a project quotation after these details are reviewed. See the glamping resort cost guide for the factors included in a modular building price.
Yes. Export preparation can include protective packaging, container planning, shipping documents and delivery coordination. The final method depends on module dimensions, quantity, destination and the agreed trade term.
Production time is confirmed for each order after drawings, configuration, quantity and material scope are approved. Custom work and order volume affect the factory schedule, so Sunhomee provides the timeline with the project quotation rather than publishing an unconfirmed standard duration.
The response can cover the reviewed configuration, supply boundary, optional items, packing approach, indicative production planning and available trade-term discussion.
Foundations, approvals, local engineering, access, unloading, lifting, utility connections and installation responsibilities depend on the destination and written project scope.
Yes. Send the approximate quantity, site context and timeline so product supply can be discussed alongside the wider resort requirements.
Share the project country, site context, intended use, estimated quantity, preferred configuration and target timeline. Access, unloading, utilities and local installation responsibilities are reviewed as the scope develops. A budget range is helpful but optional for the first enquiry.
Information needed for quotation
Include the project country, site context, expected quantity, preferred configuration and target date. Sunhomee will use these details to review factory production, export preparation and the delivery boundary. Budget is optional for the first enquiry.